About Cast in Situ Piles in Dhaka

The 25mm thick heavy steel tube is pushed Along with the finish shut by a metal shoe. On reaching the required driving resistance, a complete length cage is lowered in to your tube and stuffed with large slump concrete. The tube is then vibrated out leaving a shaft of concrete.Connect a hopper to the top of tremie pipe. After that, shut the joint i

read more